Gasification of private houses. What documents are needed for gasification of a house. What points should the owner of a private house pay special attention to during gasification?

Private homeowners today choose centralized or autonomous gasification, since this is a solution to many problems at once: cooking, heating water, space heating, and in many cases also connecting additional equipment.

Nowadays, the price of a gasification project for a private house and its execution are more affordable than the organization of stove, diesel or electric heating. Given the functionality of the gas system and the low cost of gas, this option is also much more economical during operation.

  • Wise hosts choose gas systems also because they are environmentally friendly. We all started the fight for the cleanliness of the planet and its preservation for future generations.

Project development and preparation of project documentation for a private house

To prepare a gas project for a private house, special attention is required, more than is given to others engineering networks and systems. This is understandable: gas-consuming installations are among the most dangerous objects that are subject to the strictest accounting and constant monitoring.

  • Connecting the building to the gas pipeline, followed by supplying the relevant devices with fuel, is a rather laborious process.
  • It is allowed to be engaged only by specialists with the appropriate permits.

Such craftsmen work in the Obedinenie-Gaz company. They perfectly know all the features of developing projects for private customers and implementing design solutions. We not only find the most optimal ways to obtain the results desired by the client, but also focus on the intricacies of organizing gas supply in each district of the capital region.

All project documentation for the gasification of a residential building, which will take into account the requirements of technical standards and state standards, is prepared only by personnel specialists from the relevant departments of the company. However, even having finished project, but not agreed with the gas service, it will be impossible to implement it.

To simplify the process, the design of gas pipelines is assigned to special organizations that have membership in the SRO - a group of self-regulatory organizations involved in design work. Very strict requirements for membership in the SRO are a guarantee for the customer of a well-designed project.

Our company has all the approvals that are established at the state level for such types of work. The qualifications of the company's employees to confirm the level of competence are regularly checked by special commissions. Our masters have all the necessary confirmation of their professional suitability.

List of required documents for gas supply design

Before embarking on a gas project in a private house in the Moscow region, the Obedinenie-Gas specialist will need a number of documents that must be provided to the customer. As in any other region, you will need a passport, identification code and title documents for the site and house. The list of documents in the package includes:

  • technical conditions for connection to gas networks, which are taken for buildings in Moscow and the region in GorGaz;
  • situational plan received from the administration locality, inscribed in the context of its development (situational plan land plot for gasification - this is a drawing with a gasification allotment on a scale of 1:1200 with location on the cardinal points);
  • building plan with the points of the proposed placement of equipment;
  • protocol of geological research.

Also, the designer may need additional data. It:

  • the distance between the walls of the house and the source of gas supply;
  • room sizes.

Our engineer will take measurements on his own, leaving the site after receiving your application. You can order a gasification project for a private house by phone or online. After receiving and processing the data, the calculation work and the preparation of drawing materials for the creation of a gasification project begin.

All design work is confirmed by calculations. First, the gas flow required for the simultaneous supply of all gas appliances at home is determined. After that, it is the turn of planning the route from the main gas pipeline network to the building. Mandatory devices here are a shut-off valve and a meter.

After arranging and distributing pipes, a hydraulic calculation of the gas pipeline is made. With its help, the dimensions of the pipes, as well as the pressure loss in the system, are determined. As a result of preliminary design work specifications of materials and equipment are drawn up.

  • A completed project, containing plans, diagrams, recommendations, must be coordinated with the technical department of the service that issued the technical conditions for its creation.

What points should the owner of a private house pay special attention to during gasification?

We recommend, when ordering a gasification project for a private house, to purchase equipment according to the decisions made in specialized outlets and with the provision of technical documentation for it - certificates and passports, or rely on the experience and knowledge of our designers. In the future, all these documents will be provided to the gas service employee upon delivery of the facility. Without them, it is not possible to prove the viability of design solutions and the conformity of equipment.

  • Adjustments made to an already agreed project require re-approval.
  • To avoid confusion, all installation work produced in strict accordance with the project.

After concluding a contract for a gas supply project for a private house and determining its price, all work on measurements, coordination and approval of the project falls on the shoulders of the contractor you have chosen - the Obedinenie-Gas company. We take full responsibility for the results of our work. Our experience and capabilities allow us to be confident in the result.

Consultations are free of charge throughout the service period. With our affordable prices we are ready to provide attractive discounts for the preparation of a gasification project for a house, depending on the amount of work.

Since you can order turnkey gasification from us, it will not be difficult to get these discounts. Contact by phone or online. All applications are processed promptly!

Gas is still the cheapest type of fuel. The use of "blue" fuel is economical, relatively safe and provides full automation of the heating process. But in the absence of the possibility of connecting to the central gas line, you have to look for other alternative views fuel.

Autonomous gasification of a private house is an opportunity to solve the problem of heating, without connecting to main gas. Consumer reviews prove that this option is increasingly being chosen for permanent operation.

Why you need autonomous gas supply

The reasons why an independent gas supply to a private house may be required may be different. After analyzing the statistics, we can conclude that there are several main factors that encourage the consumer to stop at individual version gasification.
  • Absence of a nearby central gas supply line.
  • The high cost of preparing project documentation and connecting to the highway.
  • The need for temporary heating of the house, until the connection to the main gas is made.
  • Non-compliance of the building with TU for gas supply. The autonomous system is less fire and explosive, therefore it can be installed in buildings where the technical conditions do not allow for the main gas to be carried out.

Autonomous gas supply of a private house is designed in each case separately. If necessary, a system is created to supply gas to several buildings or the whole village at the same time.

Equipment for gasification of a private house

Depending on the material possibilities and goals, you can choose several options for equipment designed for autonomous gasification. Before purchasing and installation, the following factors must be considered:
  1. total heated area.
  2. Number of connection nodes (only a boiler or column, stove, etc. will work)
  3. Financial expenses.
Traditionally, when designing gas supply organizations, the consumer is offered two types of autonomous systems: using a gas tank and household gas cylinders.

Providing gas from a gas tank

The gas holder is an autonomous station that processes gas mixture(propane-butane) into gas suitable for household heating equipment. The principle of operation of the repository is as follows:
  • The gas is extracted from the propane-butane mixture during the process of liquid evaporation.
  • After refueling in the gas tank, in the process of evaporation liquefied gas pressure is created.
  • The produced gas enters the reducer, which controls the supply pressure to the pipeline.
  • Gas is supplied to heating units in a residential building.
The advantages of the gas tank include the high safety of the installation, the absence of the need for constant refueling, as is the case with gas cylinders(one filling is enough for the whole heating season- depends on the volume of the tank), as well as the minimum list of documents required to put the device into operation. The disadvantages are the high cost of purchasing and installing storage.

Use of gas cylinders

Autonomous system gas heating private country house or a cottage can be performed using gas-balloon equipment.

To complete this project you will need:

  • Install a special burner for liquefied gas in a gas boiler. The exception is the new generation condensing boilers of famous European brands. Units from Buderus, Viessmann often have a built-in function that allows you to switch equipment from main gas to bottled gas without changing the burner.
  • Combine several cylinders into a single network.
  • Connect the network to the reducer with several cylinders on each side.

There is no need to coordinate with the gas service and make a project for gasification in the case of installing bottled gas supply. The main attention should be paid to compliance with fire safety rules.

How much will independent gas supply at home cost?

It is best to start work on creating an independent gas supply system by calculating future costs. How much will heating cost in each case?
  • Gas tank - most companies offer to purchase storage and install it on a turnkey basis, within 170-250 thousand rubles. (capacity for the average sizes for the house or a cottage). In the same place, you can conclude a contract for the maintenance and refueling of the station.
  • Cylinders - in this case, you will need to purchase 3-4 gas storage tanks (1100-3200 rubles units), a reducer (15,000), a burner (10-15 thousand rubles). The cost of work on autonomous gasification of a dacha or turnkey country house is calculated depending on how many gas consumption points there will be in the house. The average price ranges from 800-1500 rubles. units For the installation and connection of the boiler, they will take about 3000 more.

What documents are needed for gasification at home

The federal law does not provide for the need to prepare a project for gasification, in the case of installing autonomous, independent heating using cylinders. To put the gas tank into operation, you will need to collect several documents.
  1. Results of geodetic exploration.
  2. Certification number of the gas holder.
  3. Permission to put into operation.
This is a list of required normative documents for gasification of the building are running out. But according to current regulations, only a licensed construction company can exercise the right to install and connect domestic storage tanks for liquefied gas.

Fire safety of individual gas supply

SNIP specifies in detail the procedure for gasification of a private house. The norms intended to reduce the likelihood of an explosion or fire hazard are indicated.
  • Bottled gas – recommendations for gasification focus on proper storage tanks, as well as the requirements for boiler rooms used as a boiler room. Be sure to use a special cabinet or a separate room for placing cylinders in it. The cabinet must not leak water.
    If installed outdoors, it is necessary to insulate the storage walls with non-combustible heat-insulating material. The storage room should have a good natural and forced ventilation system. Empty containers are immediately taken out for refilling or removed from the cabinet. Cylinders are stored exclusively in a horizontal position.
  • Gas holders - requirements for the operation of gas supply systems for summer cottages and country houses, using liquefied gas storage tanks, mainly indicate the need for special protection. Before installation, it will be necessary to carry out mandatory waterproofing of the tank, install grounding and a condensate removal unit.
    Underground laying of a gas supply system to an individual residential building performed exclusively with PET pipe, without threaded connections. Minimum distance to a residential building at least 5-10 m, depending on the volume of the gas tank.
If several points of gas consumption are used at once, the laying of pipes for individual gas supply to residential buildings is carried out along the outer walls.

The standards for designing gas supply systems for summer cottages and private residential buildings may differ depending on the area. AT sanitary zones it may be necessary to maintain certain distances from the gas tank to water bodies and communication systems.

To date, autonomous gasification has become particularly relevant for private homeowners. It is optimal to order a gasification project even during construction and start its implementation when building a house. This will reduce costs and achieve maximum efficiency. Owners of already commissioned houses have the opportunity to improve their way of life. This will also require the development of a gasification project, which can be ordered from our company. Our specialists are highly qualified, which guarantees the quality of services.

What attracts autonomous system? First of all, it is cost-effectiveness compared to other energy sources and independence from centralized communications, the flawless operation of which Moscow cannot boast of today.

Stages of individual gasification of a private house

Autonomous gasification is a very important undertaking with a certain phased implementation. Individual projects gasification of residential buildings include the following stages of implementation:

Our specialist on site studies all the features of the object;

Next, a preliminary project for the gasification of a private house is being prepared for discussion options with the customer; the preliminary project gives a general idea of ​​the possible time and cost of the work;

Carrying out accurate calculations and agreeing on the final version, which allows you to determine the exact cost of the gasification project at home;

Signing an agreement;

Preparation and start of execution of project documentation, its coordination and approval in the relevant authorities;

Delivery of equipment and materials and start of the project.

To make a gasification project for a private house, our specialists must receive the following documents from the customer:

Land plot plan;

house plan;

Documentation for the gas equipment used and data on the planned increase in such equipment.

Terms of work and their cost

Our company will prepare a turnkey autonomous gasification project as soon as possible. At the same time, we guarantee the quality and safety of the system. Benefits of using our services:

Professional performance of installation works;

A wide range of accessories and materials;

Individual approach and flexible system of discounts, which allows to reduce the cost of a gasification project at home;

Efficiency and providing a guarantee for the work performed.

Autonomous gasification of a private house allows you to solve issues of energy supply and comfortable conditions residence. One of the advantages of the system is simplicity and accessibility. after-sales service. Our company not only provides turnkey gasification services, but also delivery and refueling of the system with propane-butane gas.

To the question of how much a private house gasification project costs in your particular case, you can get an answer by contacting the specialists of our company.

Specialists of Siltura LLC will develop a gasification project for the house in accordance with all standards and regulations. We carry out high-quality design of gas supply and give a guarantee for all services provided.

The project of gas supply of a private house requires a careful and responsible approach. Its creation is a painstaking process in which only professionals should participate. Before you design a system, you need to collect various documents, take permission to install it. That is why the gasification project should be developed by specialists with certain experience and skills.

Development of a gasification project: features

The gasification project for a private house is being developed in several stages and taking into account various factors. At the stage of its creation, it is necessary to take into account the location of pipelines of other communications, the number of ventilation equipment, the place where the heating boiler and chimney are installed, as well as the type of soil. The last factor is taken into account if the gas pipeline is installed underground.

Development of design and estimate documentation is the most important stage. It indicates the type of equipment for the installation of the gas supply system, as well as accurate calculations for the purchase of all components. Working documentation and a sketch of the future system greatly facilitate the installation of gas supply and simplify it.

Siltura LLC not only develops a gasification project for a house, but also installs systems in private homes. We provide a full range of autonomous gas supply services.

Why us?

The company "Siltura" guarantees each customer the maximum benefits from cooperation. Among them:

  • Favorable cost of the gasification project. It is calculated individually in each case and depends on various factors: the area of ​​the facility, the number of gas consumption points, the complexity of the project, etc.
  • Short deadlines for order fulfillment. Initially, the time that will be spent on the creation of the project is prescribed in the contract. We work in full accordance with the agreement concluded with the customer.
  • A team of qualified professionals. The experience and skills of our specialists allow them to easily cope with the creation of projects of any complexity, using the most advanced ideas and developments.
  • Full range of services. You can order both project development and installation from us. autonomous gas supply turnkey in accordance with all norms and standards.

The quality of installation and functioning of the gasification of the house depends on how well the design is done. That is why carefully choose the contractor who will develop the system. Siltura LLC is a reliable and responsible company with extensive experience. We guarantee loyal prices for services and individual approach to every client. To place an order, please contact our managers. To do this, use the contacts listed on the site.

Gas / Gasification in the Moscow Region

SUE MO "Mosoblgaz" has developed a standard calculation of the cost of gasification of individual residential buildings gasified under the program "Development of gasification in the Moscow region until 2017" for 2014.

The minimum cost of connecting to gas for a house up to 100 square meters. m will be 160 thousand rubles. This amount includes design and survey work, installation of domestic equipment (boiler, gas stove and counter), work on the tie-in, laying of a gas pipeline-inlet to a residential building.

See below for a table with the calculation of the cost of gasification of a private house.

Calculation of the cost of gasification of a private house in the Moscow region

Gasification of a private house in the Moscow region: an algorithm of actions

For gasification of an individual residential building with natural gas, it is necessary:

I. Submit documents (according to the above list) for issuance specifications to the branch of the State Unitary Enterprise MO Mosoblgaz, on the territory of the service area of ​​​​which a residential building is located:

1. Application for technical specifications

2. A copy of the applicant's passport.

3. Title documents:

3.1. For existing buildings, any of the following documents:

— Certificate of state registration of property rights;

– contract of sale, exchange, donation, etc. (registered with the Federal Service for State Registration, Cadastre and Cartography);

- lease agreement, with the consent of the owner.

- act of acceptance into operation;

- a technical passport (without a statute of limitations) issued by an organization authorized to conduct a technical inventory (Bureau of Technical Inventory), as a document confirming the fact of the creation of a construction object;

- permission to put the facility into operation.

3.2. For buildings being designed and under construction, any of the following documents:

– Certificate of state registration of the right to a land plot with the application of the cadastral plan of the land plot / cadastral passport;

- certificate of state registration of ownership, permanent (unlimited) use;

– contract of sale, exchange, donation, etc.;

- a lease agreement, with the consent of the owner;

- resolution of the Head of the municipality on the preliminary placement of the construction object, or on the design permit (in accordance with the requirements of TSN PPS-99 MO);

- a building permit issued by the head of the municipality.

4. Situational plan for the location of the gasification facility (A4 format).

Gasification of residential buildings is carried out in accordance with the gas supply scheme of the settlement. Technical conditions for connection are issued if there is a reserve of network bandwidth that ensures the transfer of the required volume natural gas.

II. On the basis of the obtained technical conditions, it is necessary to order design documentation for the gasification of a residential building in any specialized organization that has a certificate from a self-regulatory organization on admission to work on the design of gasification facilities. The right to choose a specialized organization belongs to the gasification customer.

III. Approve the developed project documentation for the gasification of a residential building in the branch of the State Unitary Enterprise MO Mosoblgaz. The design documentation for gasification is subject to re-approval if the gasification customer has not started construction of gas facilities within 24 months.

IV. Conclude a contract for the construction of a gas pipeline and installation of gas equipment with a specialized organization based on the developed project.

A specialized organization must have a certificate from a self-regulatory organization on admission to work on the construction of gas pipelines.

V. Organize a commission for the commissioning of gas pipelines and gas equipment

Acceptance for operation of distribution gas pipelines is carried out as part of the acceptance committee, with the participation of representatives of the customer, contractors, representatives of the branch of the State Unitary Enterprise MO Mosoblgaz, the inspector of the Architectural and Construction Supervision, the inspector of the Federal Service for Environmental, Technological and Nuclear Supervision and is formalized by the act of acceptance of the completed facility gas distribution system.

Commissioning of the distribution gas pipeline is carried out in the presence of a commissioning permit issued by the local government.

VI. Sign contracts:

— for the supply of natural gas from the State Unitary Enterprise MO Mosoblgaz (a branch of the State Unitary Enterprise MO Mosoblgaz at the location of the gasification facility);

- contract for Maintenance gas pipelines and gas equipment with a specialized organization.